Name: TIMOTHY BARNES Site Address: 3709 MARK DR Project Number: BLD2013-00088 Project Name: |
Alterations: $22,500.00 Electrical: $0.00 Plumbing: $0.00 HVAC: $0.00 |
|
Target: 00/00/0000 Issued: 01/29/2013 Expires: 10/16/2013 Finaled: 00/00/0000 |
FAR: 0.00 Gross: 988.00 New: 0.00 |
|
Permit Description:
Demo non load bearing wall in the Kitchen. No change to the building existing foot print. Reconstruct utilty area, and add 1/2 bath to 1st floor. Add 3 x 4 front portico to existing concrete stoop. All new windows, resurface roof, refurbish kitchen with new fixtures and finishes, refurbish full bath with new fixtures and finishes. Install new floor finishes on both levels. Replace HVAC system. New Appliance in the kithchen. Point and paint existing wall board on the 2nd level. Install, drywall and installation on the first level. |
|
|
|
|
ESTIMATED COST: $0.00 |
Total Fees: $644.47 |
| Description | Entered | Target | Completed | Status |
| Insp -BUILDING FINAL | 04/16/2013 | 04/17/2013 | 04/17/2013 | PASS |
| Insp -BUILDING FINAL | 04/11/2013 | 04/12/2013 | 04/12/2013 | FAIL |
| Insp - Close In/Concealment | 02/07/2013 | 02/08/2013 | 02/08/2013 | PASS |
| Insp - insulation | 02/05/2013 | 02/07/2013 | 02/07/2013 | PART |
| Insp - Close In/Concealment | 02/04/2013 | 02/05/2013 | 02/05/2013 | FAIL |
| Insp - Close In/Concealment | 02/01/2013 | 02/04/2013 | 02/01/2013 | CANC |
| Plan Review - SFD (Fuel Gas) | 01/29/2013 | 02/12/2013 | 01/29/2013 | APPR |
| REV Plan review - SFD ( Mech) | 01/29/2013 | 02/12/2013 | 01/29/2013 | APPR |
| REV Plan review - SFD (Plbg) | 01/29/2013 | 02/12/2013 | 01/29/2013 | APPR |
| Plan review - SFD (Building) | 01/14/2013 | 01/30/2013 | 01/29/2013 | APPR |
| Code Plan Review Complete | 01/29/2013 | 01/29/2013 | 01/29/2013 | CMPL |
| ISSUE PERMIT | 00/00/0000 | 01/29/2013 | 01/29/2013 | CMPL |
| Check For Unpaid Deposit Fee | 00/00/0000 | 00/00/0000 | 01/29/2013 | |
| Plan review - SFD (Plumbing) | 01/14/2013 | 01/29/2013 | 01/24/2013 | REJT |
| Plan review - SFD (Mechanical) | 01/14/2013 | 01/29/2013 | 01/24/2013 | REJT |
| 00/00/0000 | 00/00/0000 | 01/24/2013 | DONE | |
| Plan review - SFD (Electrical) | 01/14/2013 | 01/29/2013 | 01/15/2013 | APPR |
| Routing - Archaeology | 01/14/2013 | 01/24/2013 | 01/15/2013 | APPR |
| Prel review - SFD (Building) | 01/14/2013 | 01/30/2013 | 01/14/2013 | CLOS |
| Prel review - SFD (plumbing) | 01/14/2013 | 01/29/2013 | 01/14/2013 | CLOS |
| Prel review - SFD (mechanical) | 01/14/2013 | 01/29/2013 | 01/14/2013 | CLOS |
| Prel review - SFD (electrical) | 01/14/2013 | 01/29/2013 | 01/14/2013 | CLOS |
| Routing - P&Z/Zoning | 01/14/2013 | 01/24/2013 | 01/14/2013 | APPR |
| Routing - T&ES/Permit | 01/14/2013 | 00/00/0000 | 01/14/2013 | APPR |
| Online Application Routing | 00/00/0000 | 00/00/0000 | 01/14/2013 | CMPL |